{"id":7236,"date":"2025-05-22T11:44:01","date_gmt":"2025-05-22T11:44:01","guid":{"rendered":"https:\/\/al-mousagroup.com\/on-the-sidelines-of-launching-the-tabuk-hills-destination-nhc-signs-an-agreement-with-al-mousa-group-ltd-contracting-to-develop-infrastructure\/"},"modified":"2025-11-17T13:35:29","modified_gmt":"2025-11-17T13:35:29","slug":"on-the-sidelines-of-launching-the-tabuk-hills-destination-nhc-signs-an-agreement-with-al-mousa-group-ltd-contracting-to-develop-infrastructure","status":"publish","type":"post","link":"https:\/\/al-mousagroup.com\/en\/on-the-sidelines-of-launching-the-tabuk-hills-destination-nhc-signs-an-agreement-with-al-mousa-group-ltd-contracting-to-develop-infrastructure\/","title":{"rendered":"On the Sidelines of Launching the Tabuk Hills Destination, NHC Signs an Agreement with Al Mousa Group Ltd. \u2013 Contracting to Develop Infrastructure"},"content":{"rendered":"\n<p>Al Mousa Group Ltd. \u2013 Contracting Division is implementing the comprehensive infrastructure project for Al Qadisiyah Districts 1 &amp; 3 within the Tabuk Hills destination, on behalf of the National Housing Company (NHC).<\/p>\n\n\n\n<p><strong>Comprehensive Infrastructure Project for Al Qadisiyah Districts 1 &amp; 3 (Tabuk Hills), Tabuk City<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Executed by: Al Mousa Group Ltd.<\/li>\n\n\n\n<li>Owner: National Housing Company (NHC)<\/li>\n<\/ul>\n\n\n\n<p>This project is considered one of the most significant developments in Tabuk City and will serve as a landmark showcase for NHC\u2019s projects, being the largest in the region with a total area of&nbsp;<strong>2,376,358.6 square meters<\/strong><strong>.<\/strong><\/p>\n\n\n\n<p>Our company is executing all phases of this comprehensive infrastructure work, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Rainwater drainage and sewage networks<\/li>\n\n\n\n<li>Water supply and irrigation networks<\/li>\n\n\n\n<li>All medium and low-voltage electrical works and street lighting<\/li>\n\n\n\n<li>Road paving and sidewalks<\/li>\n<\/ul>\n\n\n\n<p>The project will serve over&nbsp;<strong>2,806 residential units<\/strong>, in addition to administrative and service buildings.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-1 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"5620\" src=\"https:\/\/al-mousagroup.com\/wp-content\/uploads\/2025\/05\/e74b918d-f70e-4856-9154-6d49887efd66-1024x682.jpg\" alt=\"\" class=\"wp-image-5620\" srcset=\"https:\/\/al-mousagroup.com\/wp-content\/uploads\/2025\/05\/e74b918d-f70e-4856-9154-6d49887efd66-1024x682.jpg 1024w, https:\/\/al-mousagroup.com\/wp-content\/uploads\/2025\/05\/e74b918d-f70e-4856-9154-6d49887efd66-300x200.jpg 300w, https:\/\/al-mousagroup.com\/wp-content\/uploads\/2025\/05\/e74b918d-f70e-4856-9154-6d49887efd66-768x511.jpg 768w, https:\/\/al-mousagroup.com\/wp-content\/uploads\/2025\/05\/e74b918d-f70e-4856-9154-6d49887efd66.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"5622\" src=\"https:\/\/al-mousagroup.com\/wp-content\/uploads\/2025\/05\/e80759e2-3a46-4b1f-9f1e-7a10a3951d57-1024x682.jpg\" alt=\"\" class=\"wp-image-5622\" srcset=\"https:\/\/al-mousagroup.com\/wp-content\/uploads\/2025\/05\/e80759e2-3a46-4b1f-9f1e-7a10a3951d57-1024x682.jpg 1024w, https:\/\/al-mousagroup.com\/wp-content\/uploads\/2025\/05\/e80759e2-3a46-4b1f-9f1e-7a10a3951d57-300x200.jpg 300w, https:\/\/al-mousagroup.com\/wp-content\/uploads\/2025\/05\/e80759e2-3a46-4b1f-9f1e-7a10a3951d57-768x511.jpg 768w, https:\/\/al-mousagroup.com\/wp-content\/uploads\/2025\/05\/e80759e2-3a46-4b1f-9f1e-7a10a3951d57.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"5623\" src=\"https:\/\/al-mousagroup.com\/wp-content\/uploads\/2025\/05\/d4e79007-ffaa-403b-9c43-c9aeda1fb050-1024x682.jpg\" alt=\"\" class=\"wp-image-5623\" srcset=\"https:\/\/al-mousagroup.com\/wp-content\/uploads\/2025\/05\/d4e79007-ffaa-403b-9c43-c9aeda1fb050-1024x682.jpg 1024w, https:\/\/al-mousagroup.com\/wp-content\/uploads\/2025\/05\/d4e79007-ffaa-403b-9c43-c9aeda1fb050-300x200.jpg 300w, https:\/\/al-mousagroup.com\/wp-content\/uploads\/2025\/05\/d4e79007-ffaa-403b-9c43-c9aeda1fb050-768x511.jpg 768w, https:\/\/al-mousagroup.com\/wp-content\/uploads\/2025\/05\/d4e79007-ffaa-403b-9c43-c9aeda1fb050.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" data-id=\"5624\" src=\"https:\/\/al-mousagroup.com\/wp-content\/uploads\/2025\/05\/65c34220-caac-433f-bc43-a00e18d85e9b-1024x1024.jpg\" alt=\"\" class=\"wp-image-5624\" srcset=\"https:\/\/al-mousagroup.com\/wp-content\/uploads\/2025\/05\/65c34220-caac-433f-bc43-a00e18d85e9b-1024x1024.jpg 1024w, https:\/\/al-mousagroup.com\/wp-content\/uploads\/2025\/05\/65c34220-caac-433f-bc43-a00e18d85e9b-300x300.jpg 300w, https:\/\/al-mousagroup.com\/wp-content\/uploads\/2025\/05\/65c34220-caac-433f-bc43-a00e18d85e9b-150x150.jpg 150w, https:\/\/al-mousagroup.com\/wp-content\/uploads\/2025\/05\/65c34220-caac-433f-bc43-a00e18d85e9b-768x768.jpg 768w, https:\/\/al-mousagroup.com\/wp-content\/uploads\/2025\/05\/65c34220-caac-433f-bc43-a00e18d85e9b.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Al Mousa Group Ltd. \u2013 Contracting Division is implementing the comprehensive infrastructure project for Al Qadisiyah Districts 1 &amp; 3 within the Tabuk Hills destination, on behalf of the National Housing Company (NHC). Comprehensive Infrastructure Project for Al Qadisiyah Districts 1 &amp; 3 (Tabuk Hills), Tabuk City This project is considered one of the most [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":7228,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[223],"tags":[],"class_list":["post-7236","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-contracting-sector-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/al-mousagroup.com\/en\/wp-json\/wp\/v2\/posts\/7236","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/al-mousagroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/al-mousagroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/al-mousagroup.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/al-mousagroup.com\/en\/wp-json\/wp\/v2\/comments?post=7236"}],"version-history":[{"count":2,"href":"https:\/\/al-mousagroup.com\/en\/wp-json\/wp\/v2\/posts\/7236\/revisions"}],"predecessor-version":[{"id":7238,"href":"https:\/\/al-mousagroup.com\/en\/wp-json\/wp\/v2\/posts\/7236\/revisions\/7238"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/al-mousagroup.com\/en\/wp-json\/wp\/v2\/media\/7228"}],"wp:attachment":[{"href":"https:\/\/al-mousagroup.com\/en\/wp-json\/wp\/v2\/media?parent=7236"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/al-mousagroup.com\/en\/wp-json\/wp\/v2\/categories?post=7236"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/al-mousagroup.com\/en\/wp-json\/wp\/v2\/tags?post=7236"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}